Future projects of VNG

At many different locations and in a variety of projects, VNG is working on the future with green gases. In addition to the now 42 biogas facilities, the focus is on the import, generation, trade, transport and storage of hydrogen. Many of the projects are interlinked, and almost all of them are planned and implemented with partners. 

SVG
H2-Projekte und Biogasanlagen VNG-Konzern

H2 import

 

Image
H2-Symbol-gruen

Project TEM
Import of green ammonia
 

Hgeneration

 

Image
H2-Symbol-gruen

Greenroot
Green hydrogen production
by electrolysis on industrial scale

Image
H2-Symbol-blau
H2GE
Production of blue low-CO2 hydrogen
Image
H2-Symbol-gruen
Bad Lauchstädt Energy Park
Production scale laboratory of energy transition,
which models hydrogen value chain from
green hydrogen
energiepark-bad-lauchstaedt.de
Image
H2-Symbol-gruen
Project AZAN
Cracker for the generation of green hydrogen
from ammonia
 
Image
H2-Symbol-gruen
greenHyBB
Establishing a value chain for green hydrogen
more 
 

 

Biogas

 

Image
Legende Symbol Biogasanlage - grau
Biogas plants of BALANCE
Erneuerbare Energien GmbH

 

 

Htransport

 

Image
Legende Symbol Gelb

ONTRAS Hydrogen Start network
New construction and conversion of old
natural gas pipelines for around 600 km of
hydrogen pipelines as part of the Germany-
wide hydrogen core network

Image
Legende Symbol Grün
Green Octopus Central Germany
Around 300 km of hydrogen pipelines
between the Salzgitter steel region via
industries in Saxony-Anhalt to the
Central German “Chemical Triangle” region 
Image
Legende Symbol Rot
H2 pipeline Bad Lauchstädt energy park
Hydrogen pipeline between the energy park
Bad Lauchstädt and the Leuna Chemical Park 
Image
Legende Symbol Blau
H2 pipeline with ONTRAS as contact partner
Part of the hydrogen core network for which
ONTRAS acts as a contact partner for demand
and planning acts. 

 

Hstorage

 

Image
H2-Symbol-gruen
GO! Storage
Project for the large-scale storage of
hydrogen in the Bad Lauchstädt
gas storage facility